To: [[Subscriber]]

 

 

 

November 2004  

 

Homepage
News & Events
Products
Support
Contact Us

 

NL   FR   EN   DE   CZ

   
       
 


You still have time until 30/11/04 for the SCIA USER Contest 2004/2005 - Subscribe today...  <more>

Due to the Armistice Day, the SCIA head office in Belgium will be closed on 11 and 12 November 2004.

The next ESA-Prima Win training will be organized in Arnhem (NL) on 15/16/19 November 2004. Contact for more information or consult our Online Training Calendar

SCIA.ESA PT 5.0: Release Days will be held in Belgium on 9 and 15 November and on 25 November in the Netherlands



Some Sceenshots from
SCIA.ESA PT 5


 










Mathcad 12 is now Available.
Go tho our webshop to buy...


 

                   
 
  

    Dear eNews reader - in this November issue we have gathered again a lot of interesting items, some hot topics from the construction world, tips & tricks of the SCIA support team and other news about our products and activities. We would already like to thank you for the many entries we received for the SCIA USER CONTEST 2005. Haven't you registered yet? Than we have good news for you. You still have time until the 30th November to enter your project(s) via our website. Register today on http://www.scia-online.com/contest2005 and win one of the fantastic prices.
 
In this edition we review the following items:

 
 
    Launched projects: SCIA Phoenix & Allplan Steel Design
    
Water accumulation in SCIA.ESA PT
    
The construction market in Dubai
    
Customers Projects: Kaal Mastenfabriek builds highly outstanding Radarmasts
    
Support Tips & Tricks: Units in SCIA.ESA PT
 
 
 

Launched projects: SCIA Phoenix &  Allplan Steel Design


Creating excellent software is a fundamental task of SCIA. For that reason Phoenix has been launched, a project with the objective to significantly improve the software development processes within SCIA in the coming years.
It concerns all aspects of creating new software, i.e. requirement management, product engineering, development and project management. The objectives are: faster time to market, increased quality & less software problems, higher customer satisfaction. Nearly all SCIA employees will ... <more>

Water accumulation in SCIA.ESA PT

 
 
Water accumulation

In the SCIA.ESA PT program a module is available for the determination of loads due to the accumulation of water. As SCIA.ESA PT works entirely in 3D, the effects of water accumulation are also entered and calculated in 3D.

Working with the module Water accumulation

The areas of the roof where water accumulation could occur have to be set. If more areas are defined in the same load case, than it can be taken into account that water accumulation can occur ... <more>



    

The construction market in Dubai

 


A legion of cranes on the edge of the desert proves that the unrestrained expansion of the building industry is still going strong in Dubai. The latest pharaonic project is called "Chess City", a site composed of 32 buildings representing a chessboard.

Dubai, the 'place to be' for tourism and business in the Gulf, the place of superlatives, is already sprinkled with buildings in futuristic style, real architectonic pearls. The skyscrapers compete with each other for luxury and elegance; one striking example is the "Bourj al-Arab" (Tower for the Arabs), the highest hotel of the world.
Among the new projects we can mention the "Bourj Dubai" which, with a height of nearly 500 m, will be the highest high-rise flat of the world; an 'under water' hotel and ... <more>


 

Kaal Mastenfabriek builds highly outstanding Radarmasts

 

The 'Radarmast of Zandvoort' is the most exceptional mast ever placed by Kaal Mastenfabriek. The special design was done by Zwarts & Jansma, a firm of architects. The building department of Rijkswaterstaat commisioned the job.
The mast, with a height of 50 m, is situated in the middle of the dunes, next to the circuit of Zandvoort (in The Netherlands). On top is placed a slowly rotating radarantenna of 6,4 m height. In total, the mast weights 45 ton, of which 20 tons for the mast, 7,5 tons for the almost massive cast-iron spheroid segments, 7,5 tons for the stairs and 10 ton for the radar with control centre. The dimensions of the base, which is poured in reinforced concrete, are no less than 9,5m by 9,5m by 1,6m.

In order to obtain accurate measuring data of the radar installation, the rotation stability of ... <more>

Tips&Tricks: Units in SCIA.ESA PT

 
 


Would you like to adapt the units of your loads or represent your results in a more accurate way? Do you prefer daN to kN, or would you like to examine your bending in cm instead of in mm?
Via the button you get to the window of the units. In this window, the number of decimals can be adapted for the required results. One could e.g increase the number of decimals of the bending in order to obtain a more accurate representation of the bending.

In this window one can always adapt the unit as well as the export format of each value.

When you are introducing the geometry, checking the results or looking at any other part of the program, you always have the button at your disposal in each menu.
Adaptations can be made at all times.

     

About this SCIA eNews

 


We would like to encourage you to give us your current e-mail address, if the one we used for this message, would not be correct or if you want us to send it to another address. The address we are using at this moment is: [[Email]].
If you would like to from this eNews, just send us an e-mail with 'unsubscribe' as the subject followed by the e-mail address to be deleted.
Please let us know if there are any topics in which you are interested. We would also like to hear any suggestions or ideas you may have on improving this eNews. 

 

 

 

SCIA Group NV - Industrieweg 1007  -  B-3540 Herk-de-Stad
 Tel: +32 (13) 55.17.75   -    Fax:+32 (13) 55.41.75

   
Copyright © 2004 SCIA Group nv-