|
|
|
|
|
Dear reader,
Allplan Engineering 2014 is being released! We also have a testimonial of Brafer, a famous Brazilian client. Our Scia Engineer Tips & Tricks should of course not be missing and we put another winner of our user contest in the spotlight, AECOM.
We are also pleased to announce a new partnership with A&S Virtual Systems!
Enjoy! |
|
|
|
|
|
|
|
Our strategic partner and sister company Allplan Systems is launching a new release. We would like to highlight briefly a few interesting aspects. This best-of-class CAD software for reinforced concrete structures comes with four main topics: Focus on internationalization, “Cloud” support, More BIM functions, Parametric modelling.
Read more
|
|
|
|
|
|
|
BRAFER, a leading Brazilian steel fabricator who rebuilt e.g. the Maracana Stadium in Rio, significantly increased their production capacity and quality by implementing Scia Steel Manager.
Great news for steel fabricators, Scia Steel Manager now interfaces with AVEVA Bocad! Scia Steel Manager had already interfaces to import 3D models from TEKLA and SDS/2, so we added the option to import the 3D model from AVEVA Bocad as well.
Read more
|
|
|
Storeys” is a tool in Scia Engineer for better “vertical orientation” in the project. They are defined by separate levels. Each level is defined its by name, height, selection, etc. You can find the Storey manager in the service “Line grid and storeys” in the main tree...
Read more
|
|
|
|
|
|
|
Aecom - Serpentine Gallery Pavilion 2013 - London, UK
Quote of the Jury: “The concept of this reusable structure was drawn up using Rhino and bespoke scripts were used to transfer the geometry to Scia Engineer for structural analysis and design. The 3D model was also used for computer aided manufacturing (CAM), as well as for better visualization and optimization of the size of the fabrication modules for onsite delivery and erection. The geometry was transferred from Scia Engineer to Revit for producing the structural drawings. Due to the different partners involved and the short project time, the use of Building Information Modeling (BIM) was essential to make this project a success.”
Read more
|
|
|
|
|